
|
 |

 |
 |
Select
one of the numbered buttons to view a portion
of the tour or take the grand tour. You will need Windows Media Player or QuickTime installed on your computer to view the tour. |
|
 |
Respecting the Environment
When MidAmerican Energy announced plans to develop a
360.5-megawatt wind energy facility, located on two sites in northwest and
north central Iowa, MidAmerican’s environmental services group worked with
the state of Iowa and several environmental groups – such as the Iowa Department
of Natural Resources, the U.S. Fish and Wildlife Service, the Nature Conservancy,
Iowa State University, the Iowa Natural Heritage Foundation and the Iowa Chapter
of the Sierra Club – to identify areas off limits for development due to specific
characteristics that attract birds.
The group created a state-wide map of the areas with known bird populations or
habitats, referred to by the environmental community as areas of concern.
MidAmerican consciously avoided these areas once the site planning was underway.
MidAmerican also reviewed the United States Department of the Interior Fish and
Wildlife Services’ Interim Guidance on Avoiding and Minimizing Wildlife Impacts
from Wind Turbines, and MidAmerican used those guidelines with turbine vendors,
engineering services and construction contractors.
In addition, MidAmerican worked with the Army Corp of Engineers to secure the
appropriate permits for potential risks to disturbing any identified wetlands.
The facility is one of the largest land-based wind projects in the world, and
regular inspections are conducted to ensure there are no adverse environmental
impacts.
About the Virtual Plant Tour
If you've ever wondered how wind is
used to generate electricity, this is the place to learn. A simple click of the mouse will take you on a guided tour
ranging from the history of wind energy to learning how a
wind turbine is controlled. Start your tour by
selecting any of the numbered icons to view specific operations and examine each phase at your own pace. Or simply
select Grand Tour to view the tour start to finish. Enjoy your tour.
If you need clarification of some of the terms used in the tour,
see our Glossary of Terms.
You must have either QuickTime or Windows Media Player installed on your computer to view the tour. If you do not have either of these, select a player, and you will automatically be redirected to the appropriate download site.


|
 |



| | | | |

©2008 MidAmerican Energy
Company. All rights reserved.
|